01 · The live estate
Sites — finished and up
Three site estates are live. The public home is buildwithnexgen.com — homepage, 6 audience pages, 8 depth pages, 6 niche blogs, intake form and assistant on every page, official logo and heroes throughout. Plants live today: Linden, UT · Pearl River, LA · Boston, MA. Coming 2026: Sparks, NV · Southern Arizona · Fort Worth, TX.
BuildWithNexGen.com
The full public estate — the canonical NexGen face. Audience pathways for builders, developers, framing crews, partners, insurance/risk, and the USA supply story.
Open the siteNiche pages
The 6-page niche set + hub, same form, assistant, and logo treatment — one page per audience, each ending in the project-fit conversation.
Open niche pagesProposal estate
Erik's 11-section proposal plus its /pages/ audience set — the original proposal microsite family the fleet was modeled on.
Open proposal estateNexGen Steel Workspace
Your internal NexGen workspace. One orb: Gemini 3.8 Live voice is live, trained on the full NexGen training doc (plan-to-panel, plant footprint, fit review, escalation to Jared, claims discipline — no prices, ever), with the official NexGen logo fixed in the panel header.
NexGen AI agent
NexGen's own site assistant — the intake form + assistant on every page of buildwithnexgen.com, trained on NexGen's training doc and wired to the project-fit conversation. NexGen's agent only; no other company's material runs through it. The public-site voice orb key is set and its embed is in progress.
02 · Proposals & overviews — NexGen's own
Every NexGen proposal — see what they look like
Each card below shows the actual proposal or overview page as it renders — a real screenshot of the piece itself, with its title and link. Anything marked sample or draft has not been sent — demonstration only, not a quote, not an offer. True Blue's materials are not here — they live in their own separated client section further down.
Draft · Oct 26, 2026
Sourcewell — partnership proposal
A focused category-fit discussion for the public cooperative purchasing agency: is there a specific public-facility need, delivery gap, or project type worth evaluating together? Ships with the tailored intro video and a six-chapter video library (process, production, cost evaluation, quality checkpoints, delivery roles, technical due diligence). Recipient and Jared's introduction route still to be confirmed — no partnership, award, or pilot is represented.
Versions: V1 + V2 proposal documents · intro video V1 & V2 · six-video series scripts
Draft overview · Not sent
Endeavor Development — partnership overview
“One framing partner, across the whole pipeline.” Endeavor keeps finding and entitling strong industrial sites; NexGen becomes the framing system behind the buildings — starting with Concord Business Center (South St. Paul), then Highway 55 Business Center, Eagan (250,000 sq ft). Conversation: Evan Mattson, Development Manager.
Draft overview · Not sent
Stencil Group — partnership overview
“A framing system for every Forte phase.” Per-company overview built for Stencil's phased multifamily work — repeatable floor plates are the panelization argument.
Internal · NexGen only
NexGen AI agent proposal + explainer set
The proposal-system explainer package (Oct 26): system-overview page, narrated explainer video, podcast episode, and scripts — how a personalized proposal gets built for each company from its own plans and list data. This is NexGen's own agent and proposal system; it stands on its own here.
Example proposal — the interactive calculator format
The format precedent for the whole fleet: the recipient's own plan set priced in steel next to lumber, cost center by cost center, assumptions adjustable, the steel premium shown honestly where it falls. Two demonstration builds:
Sample · Not sent
Builder sample — D.R. Horton
The builder-format demonstration: one project review, priced from a real plan set in the interactive comparison model.
Sample · Not sent
Developer sample — Greystar
The developer-format demonstration: phase economics — one phase of repeatable units run through the cost-center model, reported per phase and per unit.
The proposal fleet — six companies, six angles
Planned Oct 26, 2026. One audience, one exemplar, one angle, one CTA (“run it on your plans”) per page. Fit was deliberately picked over size in four of six slots. Every header carries the subject company's official logo beside NexGen's, under “Prepared for” framing — what you see in each screenshot. All six are samples until priced from the recipient's actual plans.
Builders · Draft
Sekisui House U.S.
Salt Lake City, UT · 11,712 closings (2025) · Leader: David Viger, CEO. Parent is a global leader in factory-built housing — the deepest prefab DNA on the builders list; five U.S. brands incl. Richmond American and Woodside Homes.
Developers · Draft
Greystar
Charleston, SC · 8,247 units started (2024) · Leader: Bob Faith. Largest U.S. apartment developer by 2024 starts; repeatable multifamily and build-to-rent volume is a direct fit for panelized steel. (Header is type-only — Greystar publishes no standalone logo file; never approximated.)
Framing crews · Draft
Toll Brothers
Fort Washington, PA · 11,292 closings (2025) · Leader: Karl Mistry, CEO. Already runs in-house component manufacturing/assembly — it “thinks in panels”; luxury price points absorb a framing upgrade.
Partners · Draft
Pretium Partners
New York, NY · $70B AUM · Leader: Don Mullen, Founder & CEO. Residential-only across SFR, build-to-rent, and homebuilder lending — rated arguably the single best NexGen fit by strategy.
Insurance / risk · Draft
AvalonBay Communities
Arlington, VA · 2,921 units started (2024) · Leader: Benjamin Schall. Coastal multifamily REIT that develops for its own long-term portfolio — assembly evidence and carrier questions stay live for the life of the asset. (Header type-only — no clean official logo published.)
USA supply · Draft
Building Industry Partners
Boston, MA · targets $10–350M companies · Leader: Matt Ogden, Founder. The only firm dedicated exclusively to the U.S. building industry; portfolio includes U.S. LBM and Kodiak Building Partners.
Canonical URL pattern (held on preview links per Anton's Oct 26 ruling): proposal.buildwithnexgen.com/<company-slug>.
Separate client folder
True Blue Construction — its own client materials
Kept deliberately apart from everything above. True Blue Construction is a separate company — a potential client and customer of NexGen Steel, not part of NexGen. True Blue is a family-owned general contractor in Fridley, MN (founded 2017, MN License #BC722654) that self-performs framing and builds multifamily to six stories — which is why NexGen courts it as a customer. The four pieces below are True Blue's own client materials and live in True Blue's own folder; nothing here is a NexGen site, agent, or asset.
● Live overview
OV-001 — NexGen × True Blue overview
The strategic overview for the True Blue relationship, hosted on the overview host.
Open OV-001
Strategic proposal
True Blue — strategic proposal
The full strategic proposal document for True Blue: the combined three-project, 36,000+ sq ft package (incl. Becker Edgewood Village) from the Nov 6 call, the ~$231k shipping barrier from the UT/LA plants, and a Midwest anchor plant (3–4 builders, True Blue a candidate) as the strategic answer. Scott Thompson reviews; the group reconvenes mid-next week.
Internal preview
True Blue — proposal render
The rendered internal preview of the True Blue proposal — the visual render of the strategic proposal above.
Open the render
● Live — correction applied
OV-027 — Nov 6 call overview
The Becker call overview (Anton · Jared Rothenberger · Scott Thompson, VP True Blue Commercial — 46 min, Nov 6, 2026). Attendee correction applied (Scott attended; Justin Jacobs was an invitee only). Not yet sent to Jared.
Open OV-027Also in True Blue's folder: the shareable call page staged at businesshubos.com/nexgen-steel (built, not deployed — carries the Nov 6 call recording and lead form; deploys on approval), and the OV-001 refresh from the Nov 6 call, queued.
03 · The lead board
NexGen lead board — 99 leads
The full board holds 99 leads: 80 ranked companies + 19 named projects (4 starting · 14 stalled · 1 watch), organized by segment, source, status, and region against the plant map — contacts enriched Nov 6, 2026. Below is the ranked market board (Texas, Louisiana, Utah — 15 each, 45 companies) in searchable form. Region logic: Linden UT serves UT/ID/WY/CO · Pearl River LA serves LA/MS/AL · Boston MA serves the Northeast & Mid-Atlantic · NV/AZ/TX are Coming-2026 plants. Internal prospecting — not for distribution.
Apollo top-20 lists behind the board: Builders · Developers · Brokerages · Private Equity (80 rows, compiled Oct 24, 2026). Nobody on any list has been contacted unless a project status says otherwise. No leads have arrived via Jared's partner portal or the Sourcewell channel yet — both read 0 until they do.
04 · Videos
Video library
Two finished videos, one finished end-card asset, and the WTF pilot kit — parked at your direction on Nov 6, with everything built so far kept warm (framed still, finished end card, locked line) for the day credits land. The pilot clip itself was never generated: the Higgsfield account sits at 0 credits and nothing was spent.




Also on record: the partner invitation film script (draft v2 + shot lists, ~4–4.5 min, peer-to-peer) and Jared's video-library prompt set (Oct 24). The WTF format follows the niche-ad pattern you approved: 5-second Jared hook clip + 5-second branded end card, karaoke captions.
05 · Blogs
Six niche blogs, six launch posts
One blog per audience, living under its parent page on buildwithnexgen.com, launched together Nov 6, 2026. Steady state: one post per week rotating Builders → Developers → Framing crews → Partners → Insurance → USA, with the next three topics always queued on each index. Hard rule across every post: no savings percentages, no cost-comparison numbers — the portal /claims rule wins.
The frame you don't have to fight
The Confession thesis in article form: the price of buying a frame vs. the price of building with it — and the fit review as the honest gate.
Read postBlog indexFraming is a schedule decision
Variance, repeated across buildings and phases, is the real program risk. Plan-to-panel moves decisions upstream; start with one project.
Read postBlog indexWhat a panel kit changes about your day
Sequence, labels, field files; less sorting and culling — and what deliberately doesn't change for the crew.
Read postBlog indexHow the partner model works
Plans upload marks the lead; NexGen runs the project side. Published partner terms stated plainly, with the written-terms gate.
Read postBlog indexThe risk conversation starts with the frame
Non-combustible steel as a material fact a broker can work with; documentation as the deliverable; no outcome promises — ever.
Read postBlog indexA supply map you can point to
Live: Linden UT, Pearl River LA, Boston MA. Announced for 2026: Sparks NV, Southern AZ, Fort Worth TX — “is” vs. “is coming” discipline throughout.
Read postBlog index06 · Images & brand
The Confession ad & Jared's set
The Confession campaign artwork and the five smile-corrected Jared portraits — the stills the WTF hook clips animate from. #1 is the pick for the Confession ad, #3 for his standing profile, #4 is the one builders will trust most.







Social image pack




07 · Regional sharpening
Same spear, sharper tip — by region
The tailoring layer drafted Nov 6: same plan-to-panel story, sharpened per region by the local hazards and cost drivers that make wood expensive or risky there. It feeds WTF variants, blog topics, and per-company overviews. Claims discipline holds everywhere: material facts stated plainly, never guaranteed outcomes or savings percentages.
California
Pains: seismic design, wildfire/WUI zones, very high soft costs. Angle: when engineering dollars are already heavy, a plans-based panel system starts engineering from the model, not from scratch; non-combustible material belongs in the WUI conversation. (The ~$35/sf engineering-fee figure is marked verify-before-use — it does not ship publicly until tied to a named source.)
Florida + Gulf Coast
Pains: hurricane wind loads, humidity + mold, termites, insurance strain on wood frames. Angle: steel does not feed mold or termites and does not rot in Gulf humidity; wind performance is an engineering conversation the panel model supports early.
Southeast — LA / MS / AL / GA / Carolinas
Pains: termites, mold, humidity, coastal hurricane exposure. Angle: Pearl River, LA plant is live here — local production plus materials pests and moisture can't eat; the shortest freight story in the footprint.
Mountain West — UT / ID / WY / CO + NV / AZ
Pains: wildfire, snow loads, desert termites (AZ). Angle: non-combustible material in fire country; Linden, UT plant live, Sparks NV + Southern AZ coming 2026.
Texas — DFW + Gulf
Pains: coastal windstorm, termites, freight from distant plants. Angle: the Fort Worth plant (in process) changes the shipping math on Gulf and DFW projects.
Northeast / New England
Pains: freeze-thaw, tight labor, energy-code pressure, short building season. Angle: Boston, MA plant live; framing as a schedule decision. The deepest current bench — 27 board rows sit in this region.
Upper Midwest — MN / WI / SD
Pains: freeze-thaw, spring moisture/mold, distance from every current plant. Angle: the plant story itself — local production could cut the ~$231k shipping barrier (Jared's figure, attributed) that priced steel out of a Minnesota package deal — and a Midwest anchor-plant partnership with 3–4 high-volume builders is Jared's stated model for funding it.
The honest gap
45 of 99 board rows sit outside the current plant footprint. The fix is already specced: weight the next lead pulls to plant corridors so the board grows where NexGen can actually deliver.
08 · Status & what's next
Where everything stands
Done & live
✓ buildwithnexgen.com full estate (homepage, 6 audience + 8 depth pages, blogs, form + assistant)
✓ Niche pages set + proposal estate
✓ Six niche blogs + launch posts
✓ Workspace orb — Gemini 3.8 Live voice live, trained on NexGen, logo fixed; public-site orb key set, embed in progress
✓ WTF end card built; regional matrix drafted
Parked / queued — your calls
⏸ WTF videos — parked Nov 6 at your direction. Blocker when unparked: Higgsfield at 0 credits (pilot = 7; Starter $19/mo ≈ 200 credits ≈ 28 draft clips).
• True Blue materials (separate client, above): OV-001 refresh queued; staged call page awaiting deploy approval
• CA $35/sf figure — verify-before-use
• Two site nits: duplicated eyebrow on /builders; GitHub source-of-truth ruling pending
The one-line version
NexGen's public face, proposal system, lead board, content engine, and voice orb all exist and are live or staged. The open items are approvals and credits — not builds. Pick Jared's WTF numbers and say “top up” and the pilot resumes mid-stride; say “deploy” and the staged call page in True Blue's folder goes public.