OV-027 · CALL OVERVIEW

Shared by Jared Rothenberger · NexGen Steel

NexGen Steel × True Blue Construction

On November 6, Jared walked True Blue Construction through a NexGen framing proposal built from three of their own Minnesota projects: one combined package, priced from their plans. This page is the short version: the system, the proposal, the one honest obstacle, and the bigger opportunity behind it. If you build, consider it an open invitation to have the same conversation.

NOV 6, 2026 46-MIN CALL BECKER, MINNESOTA

On the call: Jared Rothenberger (NexGen Steel) · Scott Thompson (True Blue Construction) · Anton Hocking (Business Hub OS)

01 · The System

Steel framing, planned from your plans

NexGen's system starts from a project's own architectural plans, not from a price sheet that changes by the day. Plans become an engineered model, the model drives production, and production arrives on site as kits your crew can assemble in sequence.

STEP 1Design it

Your plans become a fabrication model: openings, connections, and panel layout engineered and reviewed with you before anything is produced.

STEP 2Form it

Automated roll-forming produces the studs and panels the model calls for, the same way on every run, so the frame that arrives matches the frame that was drawn.

STEP 3Kit it

Panels and wall sections ship as numbered, labeled kits with a planned install sequence, staged for the order your crew will build in.

STEP 4Assemble it

Kits are built for assembly with the crew you already run: a planned sequence on site instead of measuring, cutting, and problem-solving in the field.

02 · The Proposal on the Table

True Blue, right now

True Blue Construction

True Blue Construction is a family-owned GC out of Fridley, Minnesota (MN License #BC722654), building since 2017 across five divisions: Commercial, Construction, Remodeling, Restoration, and Land Development. What makes them the right first conversation: they self-perform their own concrete and framing crews. True Blue sent NexGen three projects. Jared's team combined them into a single proposal:

3
Projects in one proposal

Three separate True Blue projects, combined by NexGen engineering into one package.

36,000+
Sq ft of framing

Total framing area across the combined package, including the Edgewood Village project in Becker.

1
Comparison, from their plans

One steel-versus-lumber comparison, run from True Blue's own drawings instead of a generic brochure.

Scott Thompson is now running the comparison the way it should be run: with True Blue's own local lumber and labor costs in the tool, not national averages. Both sides reconvene mid-next week to go over the finalized numbers together. Nothing is promised before those numbers land. That discipline is what makes the comparison worth trusting.

03 · The Obstacle and the Opportunity

Shipping, in the open. Then a Midwest plant.

The obstacle

NexGen's producing plants sit in Utah and Louisiana. On the True Blue package, Jared put the freight on the table himself: about $231,000 of shipping, 36 truckloads, which can eat most of the advantage steel holds over wood at Midwest distances. He showed the number anyway. It is the kind of number this page will not hide from you.

Shipping figure as Jared stated it on the Nov 6 call, for this proposal.

The opportunity: a Midwest plant

Jared's answer is a NexGen plant in the Midwest (Minnesota, Wisconsin, or South Dakota), so freight shrinks and the economics can work the way they do near the existing plants. He is assembling three or four anchor builders whose volume could carry it, and True Blue is a candidate for one of those seats. It has happened before: on the call, Jared described a Boston-area lumber company that lost a bid to NexGen, then partnered to open a local plant and now offers both wood and steel framing.

On the call, Jared put local-plant shipping at roughly 60 to 80 percent lower, with plant payback averaging two to three years: his figures, from NexGen's operating experience.

Where NexGen produces

Linden, Utah
● PRODUCING NOW
Pearl River, Louisiana
● PRODUCING NOW
Boston, Massachusetts
● PRODUCING NOW
Sparks, Nevada
● COMING IN 2026
Southern Arizona
● COMING IN 2026
Fort Worth, Texas
● COMING IN 2026

Facility map per Jared's October 2026 update.

04 · The Recording

Hear the whole call

46 minutes, unedited: the system walkthrough, the combined True Blue proposal, the shipping math, and the Midwest plant idea, exactly as it happened on November 6, 2026.

Call recording via Fathom · Jared Rothenberger, Scott Thompson, Anton Hocking

05 · The Next Step

Have the same conversation

If you have a project coming (multifamily, light commercial, or a building of your own), the first step is the same one True Blue took: a project-fit conversation with Jared, and a comparison priced from your actual plans. What could steel do to your numbers? The fit conversation is where that gets answered, on your drawings, not on a brochure.

No drawings ready yet? Bring the project you have. The fit conversation comes first either way.